ईमेल: linda@662n.com Mob: +8613924100039 (WhatsAPP)
वीचैट: airspringG Skype: guomat
| उत्पत्ति के प्लेस: | ग्वांगडोंग, चीन |
| ब्रांड नाम: | GUOMAT |
| प्रमाणन: | ISO/TS16949:2009 |
| मॉडल संख्या: | 1बी200-10 |
| न्यूनतम आदेश मात्रा: | 6pcs |
|---|---|
| मूल्य: | $49.9-59.9/pc |
| पैकेजिंग विवरण: | मजबूत कार्टन बॉक्स या ग्राहकों की जरूरत के रूप में |
| प्रसव के समय: | 2-8 काम के दिन |
| भुगतान शर्तें: | टी/टी, वेस्टर्न यूनियन, एल/सी |
| आपूर्ति की क्षमता: | 1000pcs/सप्ताह |
| सामग्री: | रबर और स्टील | गारंटी: | 12 महीने |
|---|---|---|---|
| समारोह: | झटका कम करना | बेलो नंबर: | 1बी12 |
| अचंभा: | SP1B12 / SP1B12-1 | फायरस्टोन: | W01-M58-6374 |
| वायु -याचिका: | जी 3/4 | पेंच: | एम8x1.25 |
| प्रमुखता देना: | Phoenix industrial air spring,Contitech rubber air spring,G3/4 gas-filled air spring |
||
| Parameter | Value |
|---|---|
| Top Cover Plate Diameter | 160mm |
| Bottom Cover Plate Diameter | 160mm |
| Gas Hole / Air inlet | G3/4 |
| Rubber Bellows Natural Diameter | 220mm |
| The Working Stroke | MAX 180 mm to MIN 57 mm |
| Top Cover Plate Screw (Nut) Tooth | 2XM8X1.25 |
| Bottom Cover Plate Screw (Nut) Tooth | 2XM8X1.25 |
| Screw Center Distance of Top Cover Plate | 89mm |
| Distance From Screw to Air Hole | 38mm |
| Screw Center Distance of Bottom Cover Plate | 89mm |
| Step | Core Action | Key Point |
|---|---|---|
| 1. Prepare | Power off and disconnect water. Use a jack to lift each corner of the machine one at a time. Remove the old feet. | Safety first! Only lift one corner at a time and secure it with blocks. |
| 2. Install | Position the air springs. Use bolts to secure the top end firmly to the machine's base. | The bottom end usually just needs to sit flat on the floor. |
| 3. Connect | Use air hoses to connect the air inlets of all four air springs in a series. | This ensures equal air pressure across the system. |
| 4. Level | Inflate the springs slowly and remove the jack. Use a spirit level and adjust air pressure until the machine is perfectly level. | This is the most critical step for vibration reduction. |
| 5. Test | Inflate to the specified pressure. Run a high-speed spin cycle first empty, then with load, to check for stability. | Once set, no further adjustment is needed for normal operation. |
व्यक्ति से संपर्क करें: Sunny
दूरभाष: 18928788039